Saturday, 22 March 2025

22nd March 2025 - Major Working and Major Progress

Thought for the day :"My friend says to me: “What rhymes with orange?” I said: “No it doesn’t!”"


Dry
2025 : Wet 34 : Dry 46

Saturday and luckily Dave agrees to work a weekend to help us get back on track with the timing.
The road being closed means that we can abandon the vehicles in the lane.
Dave starts clearing the lower quarter for the platforms, on the ground floor and the Mezzanine level.
Two tents on each level and access to the eco toilet, which we also dug out a bit.
Ground VERY wet and will hopefully recover before visitors arrive.   



Area flattened to allow and secure platform


More Pallets 




Most are working hard :) 


Also looking to widen the pond  but very wet here


First Bluedrop out ..  hopefully we have not damaged too many with the construction 


Digging out the area for the concrete block for the shower Unit


Cement and ballast all has to taken down to the lower quarter.
The caterpillar tuck is proving its worth 


and more pallets 



Toby checks the progress


Fence panels - a real cheek, the 3ft panel costs the same as the 6ft ones - 
May have to check B & M before we finish the job and use it 
 

Good progress for a day - and a full days work 



Cheers 