Friday, 21 March 2025

21st March 2025 - Lighting the lower quarter

Thought for the day :“I had a dream last night that I was cutting carrots with the Grim Reaper – I was dicing with death.


Wet 
2025 : Wet 34 : Dry 45

Clearing the paths more and stringing a power cable from the gate to the shower block, and stringing the lights along the cable. Testing for failures and renewing some bulbs. 
Sadly made a well intended mistake, As we did not really need all the lights shining every evening while we have no-one here it seemed like a good idea to unscrew every other bulb by half a turn so they did not light. 
Sadly, I did not think about the fact that moisture would go into the fittings and as a result those that were unscrewed are now corroded and it will take some time to clear them - will be trying WD40 later but at the moment we have a few failures which is not too bad.

A couple of breaks in the wiring have been fixed and removed a couple of burnt out sockets.  Slowly putting them all back ion place  







Cheers !


No comments:

Post a Comment